Text preview for : change89.pdf part of Funai 11AK19 Schema Elettrico e Note di servizio
Back to : TV AK19.part01.rar | Home
ELEKTRONK A..
TECHNICAL CHANGE BULLETIN TEKNK DEKLK BÜLTEN
CHANGE NO: 89 REF NO : 284 DATE :10.05.2001
AFFECTED MODELS: CHASSS 11AK19P4 (2 SC, W/FAV)
START DATE : 10.05.2001 REASONS OF CHANGE: A vertical line problem at 11 AK 19 chassis double scart with front AV models. NOTE 1: 1. Cut the copper wire between R085 and the pin 20 of the scart SC051. 2. The cable (SAP code is 30015625) has live and shield part on it. Solder one of the live part to the pin 20 of the scart and solder other end to the leg of the C051 which besides R045. Solder one of the shield part to the pin 21 of the scart and solder other end to the leg of the C427 which is connected to the ground.
NO 1 2 3 4 5 NO 1 2 3 4 5
PCB CODE
VESTEL CODE
OUT COMPONENT NAME
POSITION NUMBER
QUANTITY
PCB CODE
VESTEL CODE 30015625
IN COMPONENT NAME CABLE 2P SHIELD 110MM
POSITION NUMBER SEE NOTE 1
QUANTITY 1
APPLICATION ENGINEER
APPLICATION ENGINEER CHIEF
APPLICATION ENGINEER MANAGER
V. TOKER
BEYHAN DAITAN
Form Rev.No:00
Form No: 04.UMB.01