FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
OPTIONS MAINTENANCE SCHEDULE FOR Di350
This Maintenance Schedule is intended to be used as reference information for establishing effective field service activities. To
keep the copiers in as optimum a condition as possible, it is recommended that the maintenance jobs described in this schedule
be carried out.
It should be noted, however, that frequency of maintenance jobs determined by the number of copies is simply a guide line.
Therefore, service management personnel can revise or amend this schedule by taking into account their own individual field
experiences. We feel that this will ensure more effective copier maintenance for your customers.
V The maintenance cycle numbers given below represent the readings on the PM Counter of the copier.
C : Cleaning R : Replacement Unit : 1000 Copies
All information contained in this manual is subject to change.
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
AF-6/AF-7
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Separator Roller Assy 30 100 1166-1084-01 1 D-2
Take-Up Roller 30 -- -- 1 --
Auxiliary Roller 30 -- -- 1 --
Feed Roller 30 -- -- 1 --
Turnover Roller 30 -- -- 3 --
Exit Roller 30 -- -- 4 --
Document Scanning Position Roller 30 -- -- 1 --
Document Empty Sensor 100 -- -- 1 --
Registration Sensor 100 -- -- 1 --
NOTE
1. During regular maintenance visit, clean or replace parts as necessary.
2. K=1,000 originals
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
AFR-14
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Document Pick-Up Roller (V) 30 120 4490-3504-01 2 D-2
V 30 120 4490-3505-02 2 D-2
Document Take-Up Roller ( )
V 30 120 4490-3447-01 2 D-2
Document Separator Pad ( )
Document Transport Belt 30 -- -- 1 --
Registration Drive Roller 30 -- -- 1 --
Registration Driven Roller 30 -- -- 1 --
Turnover Roller 30 -- -- 1 --
Turnover Roll 30 -- -- 4 --
Exit Roller 30 -- -- 1 --
Exit Roll 30 -- -- 4 --
Registration Sensor 120 -- -- 2 --
NOTE
1. Replace the parts marked with V at the same time.
2. During regular maintenance visit, clean or replace parts as necessary.
3. K=1,000 originals (fed through AFR-14)
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
PF-106
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Paper Take-Up Roll 1 r 300 4496-3001-02 1 D-3
Paper Take-Up Roll 2 r 300 4496-3046-01 2 D-3
Roll with torque limiter r -- -- 1 D-6
Feed RollV r 200 4496-3013-02 1 D-5
Separator RollV r 200 4496-3045-01 1 D-5
Torque Limiter Assy.V -- 200 4496-0152-01 1 D-5
Vertical Transport Roller r -- -- 1 D-6
Vertical Transport Roll r -- -- 2 D-6
NOTE
1. The contents of the PM list are subject to change without notice.
2. K=1,000 sheets of paper
3. Clean the mechanism when a paper take-up or transport failure occurs.
4. Replace the parts marked with V at the same time.
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
PF-108
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Paper Take-Up Roll r 120 4498-3332-01 2 D-1
Vertical Transport Roller r -- -- 1 D-1
Vertical Transport Roll r -- -- 2 D-1
NOTE
1. The contents of the PM list are subject to change without notice.
2. K=1,000 sheets of paper
3. Clean the mechanism when a paper take-up or transport failure occurs.
4. Replace the expansion cassette when the number of sheets of paper that have fed through it reaches 120K.
PF-110
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Paper Take-Up Roll r 120 4498-3332-01 2 D-1
Vertical Transport Roller r -- -- 1 D-1
Vertical Transport Roll r -- -- 2 D-1
NOTE
1. The contents of the PM list are subject to change without notice.
2. K=1,000 sheets of paper
3. Clean the mechanism when a paper take-up or transport failure occurs.
4. Replace the expansion cassette when the number of sheets of paper that have fed through it reaches 120K.
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
AD-10
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Duplex Unit Transport Roller
Vr -- -- 2 D-1
1 and 2
Duplex Unit Transport Roll
Vr -- -- 4 D-1
1 and 2
Exhaust Vent area 60 -- -- 1 D-2
NOTE
1. The contents of the PM list are subject to change without notice.
2. "V" means to clean the mechanism when a paper transport failure occurs.
3. K=1,000 sheets of paper.
JS-200/OT-100
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Exit Roller 300 -- -- 1 D-1
NOTE
1. The contents of the PM list are subject to change without notice.
2. K=1,000 sheets of paper.
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
FN-100/FN-500
Maintenance Cycle (K)
PM Parts Parts No. QTY Reference Page
C R
Each Roller and Roll 300 -- -- -- --
NOTE
1. K=1,000 sheets of paper
2. During regular maintenance visit, empty Punch Scrap Box as necessary.
FrameMaker Ver.5.5(PC) MAINTENANCE SCHEDULE OPTION FOR Di350
98.11.16
Copyright
1999 MINOLTA Co., Ltd.
Printed in Japan
Use of this manual should
be strictly supervised to
avoid disclosure of
confidential information.
Issued for Di350 and other Models.
MINOLTA Co., Ltd. 4490-7993-11 99022400