Text preview for : s_af350e.pdf part of ricoh s af350e ricoh Copiers Aficio350_450 s_af350e.pdf



Back to : s_af350e.pdf | Home

Adonis-C1b/C1c
(Machine Code: A283 and A284)
SERVICE MANUAL
1IMPORTANT SAFETY NOTICES
PREVENTION OF PHYSICAL INJURY
1. Before disassembling or assembling parts of the copier and peripherals,
make sure that the copier power cord is unplugged.
2. The wall outlet should be near the copier and easily accessible.
3. Note that some components of the copier and the paper tray unit are
supplied with electrical voltage even if the main power switch is turned off.
4. If any adjustment or operation check has to be made with exterior covers off
or open while the main switch is turned on, keep hands away from electrified
or mechanically driven components.
5. If the Start key is pressed before the copier completes the warm-up period
(the Start key starts blinking red and green alternatively), keep hands away
from the mechanical and the electrical components as the copier starts
making copies as soon as the warm-up period is completed.
6. The inside and the metal parts of the fusing unit become extremely hot while
the copier is operating. Be careful to avoid touching those components with
your bare hands.

HEALTH SAFETY CONDITIONS
1. Never operate the copier without the ozone filters installed.
2. Always replace the ozone filters with the specified ones at the specified
intervals.
3. Toner and developer are non-toxic, but if you get either of them in your eyes
by accident, it may cause temporary eye discomfort. Try to remove with eye
drops or flush with water as first aid. If unsuccessful, get medical attention.

OBSERVANCE OF ELECTRICAL SAFETY STANDARDS
1. The copier and its peripherals must be installed and maintained by a
customer service representative who has completed the training course on
those models.
2. The NVRAM on the system control board has a lithium battery which can
explode if replaced incorrectly. Replace the NVRAM only with an identical
one. The manufacturer recommends replacing the entire NVRAM. Do not
recharge or burn this battery. Used NVRAM must be handled in accordance
with local regulations.
SAFETY AND ECOLOGICAL NOTES FOR DISPOSAL
1. Do not incinerate toner bottles or used toner. Toner dust may ignite suddenly
when exposed to an open flame.
2. Dispose of used toner, developer, and organic photoconductors in
accordance with local regulations. (These are non-toxic supplies.)
3. Dispose of replaced parts in accordance with local regulations.
4. When keeping used lithium batteries in order to dispose of them later, do not
put more than 100 batteries per sealed box. Storing larger numbers or not
sealing them apart may lead to chemical reactions and heat build-up.



LASER SAFETY
The Center for Devices and Radiological Health (CDRH) prohibits the repair of
laser-based optical units in the field. The optical housing unit can only be repaired
in a factory or at a location with the requisite equipment. The laser subsystem is
replaceable in the field by a qualified Customer Engineer. The laser chassis is not
repairable in the field. Customer engineers are therefore directed to return all
chassis and laser subsystems to the factory or service depot when replacement of
the optical subsystem is required.

1WARNING
Use of controls, or adjustment, or performance of procedures other than
those specified in this manual may result in hazardous radiation exposure.


1WARNING
WARNING: Turn off the main switch before attempting any of the
procedures in the Laser Unit section. Laser beams can
seriously damage your eyes.

CAUTION MARKING:
TABLE OF CONTENTS

1. OVERALL MACHINE INFORMATION ........................................ 1-1
1.1 SPECIFICATIONS .................................................................................... 1-1
1.2 PAPER EXIT TRAY SELECTION............................................................. 1-4
1.3 MACHINE CONFIGURATION .................................................................. 1-5
1.3.1 SYSTEM COMPONENTS ............................................................... 1-5
1.3.2 INSTALLABLE OPTION TABLE ...................................................... 1-7
1.4 MECHANICAL COMPONENT LAYOUT................................................... 1-8
1.5 PAPER PATH ........................................................................................... 1-9
1.6 DRIVE LAYOUT ....................................................................................... 1-9
1.7 ELECTRICAL COMPONENT DESCRIPTIONS...................................... 1-10
1.8 BOARD STRUCTURE ............................................................................ 1-14
1.8.1 BLOCK DIAGRAM ......................................................................... 1-14
1.8.2 DESCRIPTIONS ............................................................................ 1-15

2. DETAILED DESCRIPTIONS ....................................................... 2-1
2.1 SCANNING............................................................................................... 2-1
2.1.1 OVERVIEW ..................................................................................... 2-1
2.2 IMAGE PROCESSING ............................................................................. 2-2
2.2.1 OVERVIEW ..................................................................................... 2-2
2.2.2 SBU ................................................................................................. 2-3
2.2.3 IMAGE PROCESSING .................................................................... 2-4

3. INSTALLATION PROCEDURE ................................................... 3-1
3.1 INSTALLATION REQUIREMENTS .......................................................... 3-1
3.1.1 ENVIRONMENT .............................................................................. 3-1
3.1.2 MACHINE LEVEL ............................................................................ 3-1
3.1.3 MINIMUM SPACE REQUIREMENTS.............................................. 3-2
3.1.4 POWER REQUIREMENTS.............................................................. 3-3
3.2 INSTALLATION FLOW CHART................................................................ 3-4
3.3 COPIER INSTALLATION.......................................................................... 3-5
3.3.1 ACCESSORY CHECK ..................................................................... 3-5
3.3.2 INSTALLATION PROCEDURE........................................................ 3-6
3.4 PAPER TRAY UNIT INSTALLATION ..................................................... 3-11
3.4.1 ACCESSORY CHECK ................................................................... 3-11
3.4.2 INSTALLATION PROCEDURE...................................................... 3-12
3.5 1-BIN TRAY UNIT INSTALLATION ........................................................ 3-16
3.5.1 ACCESSORY CHECK ................................................................... 3-16
3.5.2 INSTALLATION PROCEDURE...................................................... 3-17
3.6 BRIDGE UNIT INSTALLATION .............................................................. 3-22
3.6.1 ACCESSORY CHECK ................................................................... 3-22
3.6.2 INSTALLATION PROCEDURE...................................................... 3-23
3.7 AUTO REVERSE DOCUMENT FEEDER INSTALLATION .................... 3-25
3.7.1 ACCESSORY CHECK ................................................................... 3-25
3.7.2 INSTALLATION PROCEDURE...................................................... 3-26


i
3.8 LCT INSTALLATION .............................................................................. 3-28
3.8.1 ACCESSORY CHECK ................................................................... 3-28
3.8.2 INSTALLATION PROCEDURE...................................................... 3-29
3.9 1,000-SHEET FINISHER INSTALLATION.............................................. 3-31
3.9.1 ACCESSORY CHECK ................................................................... 3-31
3.9.2 INSTALLATION PROCEDURE...................................................... 3-32
3.10 3,000-SHEET FINISHER INSTALLATION............................................ 3-35
3.10.1 ACCESSORY CHECK ................................................................. 3-35
3.10.2 INSTALLATION PROCEDURE.................................................... 3-36
3.11 PUNCH UNIT INSTALLATION ............................................................. 3-39
3.11.1 ACCESSORY CHECK ................................................................. 3-39
3.11.2 INSTALLATION PROCEDURE.................................................... 3-40
3.12 PLATEN COVER INSTALLATION........................................................ 3-43
3.13 KEY COUNTER INSTALLATION ......................................................... 3-44
3.14 ANTI-CONDENSATION HEATER ........................................................ 3-46
3.15 TRAY HEATER..................................................................................... 3-48
3.16 TRAY HEATER (OPTIONAL PAPER TRAY UNIT) .............................. 3-49

4. SERVICE TABLES ...................................................................... 4-1
4.1 SERVICE PROGRAM MODE TABLES .................................................... 4-1
4.1.1 TEST PATTERN PRINTING (SP2-902)......................................... 4-42
4.1.2 INPUT CHECK............................................................................... 4-43
4.1.3 OUTPUT CHECK........................................................................... 4-47
4.1.4 SYSTEM PARAMETER AND DATA LISTS (SMC LISTS)............. 4-48
4.1.5 NIP BAND WIDTH ADJUSTMENT (SP1-109) ............................... 4-49
4.1.6 MEMORY ALL CLEAR (SP5-801) ................................................. 4-50
4.1.7 SOFTWARE RESET...................................................................... 4-51
4.1.8 SYSTEM SETTING AND COPY SETTING (UP MODE) RESET... 4-51
4.1.9 NVRAM DATA DOWNLOAD ......................................................... 4-52
4.2 PROGRAM DOWNLOAD ....................................................................... 4-54
4.3 USER PROGRAM MODE....................................................................... 4-58
4.3.1 HOW TO ENTER AND EXIT UP MODE ........................................ 4-58
4.3.2 UP MODE TABLE.......................................................................... 4-58
4.4 TEST POINTS/DIP SWITCHES/LEDS ................................................... 4-60
4.4.1 DIP SWITCHES ............................................................................. 4-60
4.4.2 TEST POINTS ............................................................................... 4-60
4.4.3 LEDS ............................................................................................. 4-61
4.5 SPECIAL TOOLS AND LUBRICANTS ................................................... 4-61
4.5.1 SPECIAL TOOLS........................................................................... 4-61
4.5.2 LUBRICANTS ................................................................................ 4-61

5. PREVENTIVE MAINTENANCE SCHEDULE............................... 5-1
5.1 PM TABLE ................................................................................................ 5-1




ii
6. REPLACEMENT AND ADJUSTMENT........................................ 6-1
6.1 SCANNER UNIT....................................................................................... 6-1
6.1.1 EXPOSURE GLASS ........................................................................ 6-1
6.1.2 SCANNER EXTERIOR/OPERATION PANEL ................................. 6-2
6.1.3 LENS BLOCK/SBU ASSEMBLY...................................................... 6-3
6.1.4 SCANNER MOTOR ......................................................................... 6-4
6.1.5 SIB/LAMP STABILIZER................................................................... 6-5
6.2 LASER UNIT............................................................................................. 6-6
6.2.1 CAUTION DECAL LOCATIONS ...................................................... 6-6
6.2.2 LASER UNIT.................................................................................... 6-7
6.2.3 LASER BEAM PITCH ADJUSTMENT ............................................. 6-8
6.3 COPY ADJUSTMENTS: PRINTING/SCANNING ..................................... 6-9
6.3.1 PRINTING........................................................................................ 6-9
6.3.2 SCANNING .................................................................................... 6-12
6.3.3 ADF IMAGE ADJUSTMENT .......................................................... 6-14

7. TROUBLESHOOTING................................................................. 7-1
7.1 SERVICE CALL CONDITIONS................................................................. 7-1
7.1.1 SUMMARY....................................................................................... 7-1
7.1.2 SC CODE DESCRIPTIONS............................................................. 7-2
7.2 ELECTRICAL COMPONENT DEFECTS................................................ 7-24
7.2.1 SENSORS ..................................................................................... 7-24
7.2.2 SWITCHES .................................................................................... 7-25
7.3 BLOWN FUSE CONDITIONS................................................................. 7-26




iii
14 January, 2000 SPECIFICATIONS


1. OVERALL MACHINE INFORMATION




Information
Overall
1.1 SPECIFICATIONS
The "*" mark indicates differences between these machines and the NAD
machines.

Adonis-C1b (35 cpm) Adonis-C1c (45 cpm) Note
Configuration: Desktop
Copy Process: Dry electrostatic transfer system
Original: Sheet/Book
Original Size Maximum A3/11" x 17"
Copy Paper Maximum:
Size: A3/11" x 17"
Minimum:
A5/5.5" x 8.5" lengthwise (Paper tray / Duplex)
A6/5.5" x 8.5" lengthwise (By-pass)
Copy Paper Paper Tray/Duplex:
Weight: 64 - 105 g/m2, 20