Text preview for : T5-MECHA.pdf part of Daewoo T5-MECHA Daewoo MECHA T5-MECHA T5-MECHA.pdf



Back to : T5-MECHA.pdf | Home

T5 - DECK MECHANISM
(For EUROPE)
Caution
: In this Manual, some parts can be changed for improving, their
performance without notice in the parts list. So, if you need the
latest parts information,please refer to PPL(Parts Price List) in
Service Information Center (http://svc.dwe.co.kr).


CONTENTS
1. DESCRIPTION OF THE MECHANISM ....................................................2
2. ASSEMBLY DIAGRAM AND MAJOR PARTS CHECK.........................4
3. DIASSEMBLY AND REPLACEMENT .....................................................10
4. MECHANICAL ADJUSTMENT .................................................................16
5. ADJUSTMENT OF THE TAPE TRANSPORTING SYSTEM .................19
6. EXPLODED VIEW........................................................................................25
7. PARTS LIST....................................................................................................29
1. DESCRIPTION OF THE MECHANISM
1-1 Characteristic of T5-DECK MECHANISM

1) T5-MECHA follows the VHS and the NTSC standard.
2) T5-MECHA uses 3 MOTORS (DRUM MOTOR, CAPSTAN MOTOR, L/C MOTOR).
3) T5-MECHA uses L/C Motor to drive FRONT LOADING.
4) T5-MECHA uses 4-BIT MODE signal to recognize each MODE.
This 4-BIT MODE signal is generated from the cam switch driven by the L/C MOTOR.
5) T5-MECHA has 7MODES (EJECT/INITIAL/REV/IDLE/PLAY,STOP,SLOW/BRAKE/FF&REW) operation.
6) T5-MECHA deduce the MODE changing time by adopting the full loading system which maintains the
tape winding the drum circumference.
7) T5-MECHA can be separated from the main pcb, and be assembled with B-B type connector. This B-B type
connectioning means that CAPSTAN MOTOR, LC MOTOR, AC HEAD, FE HEAD, DRUM are connected
directly without using connector cable.




2
1-2 Wire Diagram




1-3 Connector Pin Arrangement




3
2. ASSEMBLY DIAGRAM AND MAJOR PARTS CHECK
2-1 Assembly Diagram
2-1-1) DECK Assembly Diagram
A. UPPER VIEW




1 MAINBASE ASS'Y 9 IDLER PLATE TOTAL ASS'Y 17 AC HEAD ASS'Y
2 DRUM ASS'Y 10 T BRAKE ASS'Y 18 T SLANT POLE ASS'Y
3 FE HEAD 11 FL RACK 24 CABLE FFC
4 S SLANT POLE ASS'Y 12 RELAY LEVER
5 TENSION BAND ASS'Y 13 CAPSTAN MOTOR
6 S BRAKE ASS'Y 14 LC BRKT ASS'Y
7 REEL TABLE 15 PINCH LEVER TOTAL ASS'Y
8 REEL BRKT TOTAL ASS'Y 16 CAM GEAR


4
B. BOTTOM VIEW




19 LOADING RACK
20 L LOADING ASS'Y
21 R LOADING ASS'Y
22 CONNECT PLATE
23 REEL BELT
24 CABLE FFC




5
2-1-2) FRONT LOADING Assembly Diagram




!
@

#




*
$
&
%


^




1 FL BRKT L 5 CST HOLDER AS
2 TOP PLATE 6 DOOR OPENER
3 SAFETY LEVER L 7 SAFETY LEVER R
4 LOADING LEVER AS 8 FL BRKT R




6
2-2 Periodic Maintenance and Service Schedule
2-2-2) Cleaning and Lubrication
2-2-1) Periodic Maintenance and Service A. Cleaning of Tape Transporting section and driving section
Schedule a. Cleaning of Tape Transporting section
A. In order to effectively maintain the excellent performance - The following parts shoule be cleaned after every 500
and fully utilize the features of this apperatus and to hours of use.
lengthen the life of mechanism and tapes, we strongly