File name Panasonic MiniDV N Mechanism Service.pdfService Manual
TOP NEXT ORDER NO. VMD0105012C8
Digital Video Camera/ Recorder
q
N-MECHANISM
© 2001 Matsushita Electric Industrial Co., Ltd. All rights reserved. Unauthorized copying and distribution is a violation of law.
TOP NEXT
Table Of Contents
COVER 1 MECHANICAL PARTS LOCATION 2 SERVICING FIXTURES & TOOLS 3 DISASSEMBLY PROCEDURE 4 ASSEMBLY PROCEDURE 5 MECHANICAL ADJUSTMENT 5.1 ADJUSTMENT TABLE 5.2 ADJUSTMENT PROCEDURE 6 EXPLODED VIEWS 6.1 VCR MECHANISM SECTION 7 REPLACEMENT PARTS LIST 7.1 VCR MECHANISM SECTION PARTS LIST
1 MECHANICAL PARTS LOCATION
TOP PREVIOUS NEXT
TOP PREVIOUS NEXT
2 SERVICING FIXTURES& TOOLS
TOP PREVIOUS NEXT
Parts Name Mechanism Oil Grease Tension Adjustment Plate ENV Detector Board DV Alignment Tape 232C(M3) I/F Cable Mesuring Board EVR Connector Board Connection Adaptor 30 pin Flat Cable Pcs 1 1 1 1 1 1 1 1 1 2 Parts No. VFK1700 VFK1298A VFK1686 VFK1641 VFM3110EDS VFK1395 VFK1308E VFK1309 VFK1309EX VFK1317 VFK1511 DC Output Cable 1 VJA0941 New O O O O O 200mm type 300mm type PAL Remarks Pink White
TOP PREVIOUS NEXT
3 DISASSEMBLY PROCEDURE
TOP PREVIOUS NEXT
No. 1 Dumper Item Fig. Fig. 1 Fig. 2 2 Garage U. Fig. 31 Fig. 32 3 4 Mechanism Flexible Cable Cylinder U. Fig. 4 Fig. 51 Fig. 52 5 TR Band & TR Arm U. Fig. 6 Release Eject Lever Release Lock(A) Disengage Joints(B) at S and T sides Procedure
Disengage Joints(C) at S and T sides (*S side first)
1) Desolder each terminal 2) Release 6 Hooks(D) 1)Remove 4 Screws(E) 2)Remove Cylinder Spring Remove 1 Screw(F)
1)Release Hook(G) 2)Remove Tension Adj. Screw 3)Release Lock(H) Make full loading condition with 3V battery.
6
Reel Plate U.
Fig. 71 Fig. 72 Fig. 73 Fig. 74 Fig. 75 Fig. 76
Release Lock(I), (J), (K), (L).
Release Lock(M), (N), (O), (P) (*Lock(M) first)
Release Lock(Q)
Release Lock(R), (S)
Take Reel Plate U. out
7
Pinch Arm U.
Fig. 8
1)Make slightly unloading with 3V battery until Pinch Arm comes off the Capstan Shaft. 2)Release Lock(T) Release Lock(U)
8
T3 Arm U.
Fig. 9
9 10 11 12 13 14 15 16 17 18
Loading Motor U. TR Rod Brake Gear S-Boat U. & S-Post Loading Band T-Boat U. & T-Post Loading Band Rail Connection Worm Mode SW Gear T Load Gear Center Gear
Fig. 10 Fig. 11 Fig. 12 Fig. 13
Release Locks(V) Take TR Rod out Take Brake Gear out Pull out S-Loading Band, S-Boat U., T-Loading Band and T-Boat U.
Fig. 14 Fig. 15 Fig. 16
Release Locks(W), (X), (Y), (Z), (a) Take Connection Worm Gear out Take Mode SW, T Load and Center Gears out
Fig. 1
Fig. 2
Fig. 3-1
Fig. 3-2
Fig. 4
Fig. 5-1
Fig. 5-2
Fig. 6
Fig. 7-1
Fig. 7-2
Fig. 7-3
Fig. 7-4
Fig. 7-5
Fig. 7-6
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
TOP PREVIOUS NEXT
4 ASSEMBLY PROCEDURE
TOP PREVIOUS NEXT
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Center Gear Mode SW Gear T Load Gear Rail Connection Worm S-Boat U. & S-Post Loading Band T-Boat U. & T-Post Loading Band Brake Gear TR Rod Loading Motor U. T3 Arm U. Pinch Arm U. Reel Plate U. Fig. 5 Fig. 6 Fi |