File name SB-2LY-0005-C284 - Изменения конструкции.pdf(Page.1/5)
Service Bulletin Ref. No. 2LY-0005 (C284)
October 23, 2012
Conformity to the ErP Lot6 (Change of the Main Power Switch
Subject and the Control PWB, Firmware Upgrade)
--- For KDE, UTAX/TA and Olivetti only
FS-1120D_FS-1320D_05.00.0010_(2012-06-21)
Model FS-1120D, FS-1320D l:
KMC's Classification Entire Stock Rework In-Field modification at next visit
In-Field modification by case No modification necessary
Field Measure:
When replacing the parts in the machine conforming to the ErP Lot6, please make sure to use the parts
conforming to the ErP Lot6.
As for the current models, please use the old parts except the left cover (No.1) and the control PWB (No.12).
(Both of the new and the old parts of No.1 and No.12 can be used.)
(*) Please note that the error may appear or operation failure may occur if the parts in the wrong combination
are applied. For more details, please refer to [Operation list] on the page 3.
Serial Nos. of the Affected Machines: Please refer to the page 4.
Topic
In order to conform to the power consumption requirements during standby and OFF modes (Energy related-
Products Lot6) in EU countries, the main power OFF timer function (Note 1) was added by changing the main
switch, the control PWB and the neighboring parts and by upgrading the firmware. (For more details, please refer to
the following pages.)
(Note 1) It is a new function to automatically turn the main switch OFF after passing the certain time
since the last use of the machine.
The new product codes and the serial numbers were newly set up for the models with the main power OFF timer
function in order to conform to the ErP Lot6. (Please refer to the last page.)
Content of Changes
Exterior change: The following changes were made to relocate the main power switch from the machine left rear
side to the front of the right cover. Also, the switch was changed from the primary to the secondary power control.
- Left cover side : The space was filled and the CONN. CORD ASSY was changed due to disuse
of the main power switch.
- Right cover side: The KEY POWER was added, the right cover was changed, and the parts
such as the holder were added.
Inner change: - Right frame: The shape was changed in order to add the MOUNT PWB SW.
- The MOUNT PWB SW and the other parts such as the switch were added.
- Control PWB: The DC/DC converter was changed and the circuit breaker, et |