File information: | |
File name: | 2589 Optimal RF-Switch.pdf [preview 2589 Optimal RF-Switch] |
Size: | 252 kB |
Extension: | |
Mfg: | Keithley |
Model: | 2589 Optimal RF-Switch 🔎 |
Original: | 2589 Optimal RF-Switch 🔎 |
Descr: | Keithley Appnotes 2589 Optimal RF-Switch.pdf |
Group: | Electronics > Other |
Uploaded: | 23-03-2020 |
User: | Anonymous |
Multipart: | No multipart |
Information about the files in archive: | ||
Decompress result: | OK | |
Extracted files: | 1 | |
File name 2589 Optimal RF-Switch.pdf Number 2310 Application Note Configuring an Optimal Series RF/Microwave Switch System Introduction example, mobile phone) lifetime test illustrated in Figure 1, the DUT can be stressed at an elevated level for a specified period, Given the explosive growth of the communications industry, a then its electrical characteristics can be measured. The DUT can tremendous amount of testing is being performed on the various be stressed even further and the electrical characteristics can be components that make up different communications systems. measured again. Automated switching allows this process to be These components range from active components such as Radio performed very efficiently. Frequency Integrated Circuits (RFICs) and Microwave Monolithic Integrated Circuits (MMICs) to space communication systems. This note will briefly discuss several important aspects of While the testing requirements and procedures for these compo- configuring a high frequency switch system, including the system nents differ widely, all are tested at very high frequencies, typi- configurations and the critical switch specifications. cally at gigahertz or higher. The main components in a typical test system may include DC bias, DC measurement, RF power meter, network analyzer, etc. Automating the test process and Configuration of a Switch System improving test efficiency demands integrating RF/ Microwave and Switch systems can be very simple or quite elaborate. For exam- low frequency switching systems into the test system. ple, a Single Pole Double Throw (SPDT) switch can be used to The purpose of a switch is to route signals from measure- route signals to two different DUTs. It can be expanded further ment instruments to the Device Under Test (DUT). With the into a "multiplexer" configuration so that a single instrument can help of a switch, an instrument can measure multiple DUTs with be routed to many different DUTs. Multiple instruments can be increased efficiency. Multiple tests with different instruments routed to multiple DUTs. In this case, the switch system is known can be run on the same DUT or multiple instruments can test either as a Multiplexer-Demultiplexer or a blocking matrix--only multiple DUTs. With the help of a switch system, the test process one signal path is active at any given time. Figure 2 shows the can also be automated. For example, in the typical DUT (in this application of an SPDT and a 1 |
Date | User | Rating | Comment |